Custom Boxes Zone vs Half Price Packaging
This page sets out what to ask, not what to conclude. Take current capabilities, pricing and lead times directly from Custom Boxes Zone, and compare them against a Half Price Packaging proposal built from identical requirements.





















Bulk pricing
From $0.38 per unit
At a 50 unit minimum. Final price depends on size, material, and finishing.
Key Takeaway
A supplier comparison is only useful when both providers answer the same written brief and state their terms the same way. Ask about construction, materials, artwork requirements, proof rounds, minimums, production and delivery timing, and what the quoted price includes, then rank the proposals by how few questions each one leaves open. HPP orders start at 50 units, with 100 or more required for specialty rigid formats. Production runs from about 7 business days, depending on the product, quantity and finishing, plus 2 to 5 business days for delivery. Call (866) 225-2112.
HPP orders start at 50 units, with 100 or more required for specialty rigid formats. Call (866) 225-2112 with the product, dimensions, artwork status, quantity, finish and destination.
Build the brief once and reuse it
Record the packed product, dimensions, weight, structure, artwork status, quantity, finishing, destination and required delivery date in one document and send it unchanged to each supplier.
Reusing the same document removes the most common source of a misleading comparison, which is two suppliers quoting slightly different things.
Ask about construction against your product
Ask which constructions can be quoted for your exact internal clearance, insert requirement, closure and packed weight, rather than for the product category in general.
Compare the named structures in the two proposals. A gallery image is not a specification and should not be treated as one.
Artwork, dielines and proof rounds
Confirm the file format required, who draws the dieline, how many proof rounds are included and the cost of a change after approval. These terms are where suppliers differ most.
Ask what a physical sample costs and how long it takes. Fit problems show up on a sample and rarely on a screen proof.
Minimums, timing and inclusions
HPP orders start at 50 units, with 100 or more required for specialty rigid formats, counted per printed version. Ask how the alternative minimum is counted before you compare numbers.
Ask whether tooling, proofs and freight sit inside the quoted price, and what the terms are if the delivered quantity differs from the ordered quantity.
Making the decision
Rank the proposals by how many questions each one leaves open rather than by the headline number, then confirm the remaining items in writing before ordering.
Call (866) 225-2112 with a complete brief to get an HPP proposal you can set beside the other.
Frequently asked questions
What makes a supplier comparison meaningful?
Both suppliers answering the same written brief and stating their terms the same way. Send one unchanged document covering product, dimensions, weight, structure, artwork, quantity, finishing, destination and required date.
How is the HPP minimum counted?
Orders start at 50 units, with 100 or more required for specialty rigid formats, counted per printed version rather than across the whole order. Ask how any other supplier counts theirs before comparing the two figures.
How should lead times be compared?
Split into production and delivery. HPP production runs from about 7 business days, depending on the product, quantity and finishing, plus 2 to 5 business days for delivery. Ask each supplier to state it the same way.
What should I confirm about artwork?
The file format required, who draws the dieline, how many proof rounds are included and the cost of a change after approval. Also ask what a physical sample costs, since fit problems rarely show on a screen proof.
What is often left out of a quote?
Tooling, proofs, freight and the terms covering a delivered quantity that differs from the ordered quantity. Ask explicitly about each, because that is where two otherwise similar quotes diverge.
Where do I get current details on the other supplier?
Directly from them. Capabilities, pricing and lead times change over time, so a useful comparison relies on current information from each provider rather than a third party summary.
Why buyers order from Half Price Packaging
- Orders start at 50 units, with 100 or more for specialty rigid formats
- Free design assistance and a digital proof approved by you before production
- Free shipping across the US
- Size guides and spec tables published from real production data
- Production runs from about 7 business days, depending on the product, quantity, and finishing, plus 2 to 5 business days for delivery
- Talk to a packaging specialist at (866) 225-2112
Related products
Further reading
Try Before You Commit - To Us
We’re sure you’ll love what we offer. Request your samples today, and if you place an order within 30 days of receiving them, we’ll credit the cost of your samples-making them absolutely free!




